SPECIFICATIONS
Specifications (specs) are specific to each set of plans we do – no matter if they are stock plans, modified plans, or a total custom draw from start to finish. These optional specs are attached to each copy of your plans at the time of printing.
Near the end of the design process, HGDG will call to set an appointment to write your specs. This meeting is extremely important and usually lasts five or more hours. During this interactive discussion, you will go through each item on the spec sheet and decide which materials you want in your home – just like preparing a grocery list. This comprehensive list outlines the description, type, and size of material needed to build your home.
Included are:
- Masonry veneer and
Fireplace materials
- Framing lumber
- Roofing and sheet metal
- Windows and doors
- Exterior sheathing and trim
- Tile and flooring
- Plumbing Fixtures
- Interior trim
- Electrical and HVAC
- Kitchen cabinets
- And much more
This handy list helps you and your builder cost out materials and serves as a ready reference sheet when you are compiling bids. It also provides a cross check against the materials specified on the plans. For the layman this 6 page document is critical to building your house correctly.
When combined with the house plans, a signed contract, and schedule, the specifications become a legal document and record for building your new home.
____
Printable Information Needed To Complete A Set Of Specifications
Information Needed To Complete A Set Of Specifications
This questionnaire is for our clients to download & try to complete by checking or filling-in the blanks. You may take this list to various building supply outlets and or local builders. Some of your answers may require additional changes to our stock plans. We will review the questionnaire with you when writing your Specifications as part of our Construction Print Package ($1,800.00) at one of our meetings as we complete your plans. Builders will need your Specifications for a complete itemized quote. Changes can still be made during construction, but will require extra change orders.
____________________________________________________________________________
1: CONTRACT INFORMATION:
Who will construct your home _________________________ ____ Owner ____ Builder
Who will provide the following Permits?
Builders Risk Insurance ______________________________ ____ Owner ____ Builder
General Liability Insurance ___________________________ ____ Owner ____ Builder
Workman’s Comp Insurance _________________________ ____ Owner ____ Builder
Building Permits ____________________________________ ____ Owner ____ Builder
2. SITE WORK:
Who will clear your lot ______________________________ ___ Owner ___ Builder
Who will provide the final grading ______________________ ___ Owner ___ Builder
Who is responsible for accessing the site during construction ___ Owner ___ Builder
3. FOUNDATION: (What type will your home have?)
___ Concrete Slab ___ Crawl Space ___Elevated ___ Basement ___ Brick Veneer ___ Stucco ___ Wood Piling
4. FLOOR FRAMING:
___ 2x10” or 2x12” Framing Lumber ___ “I” Joist ___ Open Web Truss
5. EXTERIOR WALLS:
___ 2x4” Frame ___ 2x6” Frame ___Concrete Block
Finished Material: ___ Vinyl Siding ___ Hardi-plank Fiber cement ___Brick Veneer ___Stucco
6. CEILING HEIGHTS DESIRED: ( check stock plan first)
Main Floor - ___ 8’ 1 ½” ___ 9’ 1 ½” ___ 10’ 1 ½”
Second Floor - ___ 8’ 1 ½” ___ 9” 1 ½” ___ 10’ 1 ½”
Basement - ___ 8’ 1 ½” ___ 8’ 9 ½” ___ Other
7. SOFFIT & OVERHANG MATERIAL:
___ Perforated Vinyl ___ Fiber cement ___ Wood
8. ROOFING:
___ Fiberglass Shingles ___ Standing Seam Pre-finished Metal ___ Other
___ Seal-O-Flex ______ Fiberglass (for flat roofs only)
9. GUTTERS:
Rain Diverters Only _____ Gutters & Downspouts ___ Aluminum Material ____ Vinyl Material_______
10. FIREPLACE:
___ Solid Masonry ___ Pre-Built Unit ___ Wood Burning Unit ___ Natural Gas ___ propane
___ Raised Hearth ___ Flush Hearth
Type of Mantel Desired ______________________________________________________________________________
Type of Material around Opening ____________________________ Hearth ____________________________________
Non Vented Gas _______ Vented Material for Chimney _________________________________
11. WINDOWS: (Do you know the Manufacturer) _____________________________________________
Type: ___ Single Hung ___ Double Hung ___ Casement ___ Awning ___ Horizontal Sliders
Material: ___ Wood ___ Vinyl Clad ___ All Vinyl ___ Metal Clad ___ Other
Type of Glass: ___ Standard Insulated Glass ___Reflective & Insulated Glass ___ Impact Glass
Casing Width ___2 ¼” ____ 3 ¼” ____ 5 ¼” ____ Window Stools ___Picture Frame ____Return Sheetrock
Casing Type _____________________________________________________________________________________
12. EXTERIOR DOORS:
Material: ___ Wood ___ Metal ___Fiberglass ___Reflective Insulated Glass ___ Impact Glass
Allowance $______________________________
13. SHUTTERS:
___ Vinyl Fixed Louvers ___ Vinyl Fixed Panels ___ Operating Louvers ___ Operating Panels ___ Storm Shutters
48”x96” OSB Plywood Sheets___________________________________________________
14. INSULATION:
Exterior Walls: R-_____ Fiberglass Batts ____________ Sprayed Foam _______________ Blown Cellulose
Interior Walls For Sound: Location ___________________________________________________________________
Ceiling: ___ Fiberglass Batts ___R-30 ___ R-38 ___ Sprayed Foam ____ Blown Cellulose
Floor : ___ Fiberglass Batts ___ R-19 _____Other___________________________________________________
15. GYPSUM (Sheetrock):
__ ½” Thick __ 5/8” Thick __ Smooth Finish __ Textured Finish ___ Painting Material _________________________
16: INTERIOR DOORS & TRIM:
Door Type: ___ Wood ___ Molded Masonite ___ Fiberglass
Style: ___ 2 Panel ___ 3 Panel ___ 4 Panel ___ 6 Panel ___ Flush
___ Hollow Core ___ Solid Core ___ Smooth Finish ___Wood Textured
Casing Size: ___ 2 ¼” ___ 3 ¼” ____ 5 ¼” (Note: 5 ¼” requires a plan change)
Style: ____________________________________________________________________________________________
Baseboards: ___ 3 ½” High ___ 5 ¼” High ___ 7 ¼” High ___9 ¼” High ___ 1 Piece ____ 2 Piece
Material: ___ Pine ___ Fir ___MDF Molded
Shoe Mold: ___ Oak ___ Pine ___Molded Location ______________________________________________
Crown Molding: Type _______________________________________________________________________________
Room Locations: __________________________________________________________________________________
Chair Rail Type: ____________________________________________________________________________________
Location: ________________________________________________________________________________________
Closet Rods: ___ White Aluminum ___ Closet Maid White Wire Type
Closet Shelves: ___ Painted ¾” Plywood with Banded Edge ___ Closet Maid White Wire Type
17: INTERIOR STAIRS:
Basement: Step Material _________ Riser Material _________ Handrail _________ Balusters _________
Main: Steps Material_________ Riser Material _________ Handrail _________ Balusters _________
Attic _____________________________________________________________________________________________
18. TYPE OF FLOORING: (We will show a price per sq. allowance )
Carpet Locations: __________________________________________________________________________
Hardwood Type: __________________________ Width ______ Pre-finished ____ Unfinished __________
Hardwood Locations: ______________________________________________________________________
Ceramic Tile Locations: ____________________________________________________________________
Resilient / Vinyl Tile Locations: ______________________________________________________________
Other Type Flooring _______________________ Locations ___________________________________
19. CABINET MATERIAL OR BRAND: (We will show an allowance )
Kitchen: ________________________ Counter Top Material: ________________ Backsplash Material ____________
Powder Room: __________________ Counter Top Material: ______________________________________________
Master Bath: ____________________ Counter Top Material: ______________________________________________
Hall Baths: _____________________ Counter Top Material: ______________________________________________
Basement Bath: _________________ Counter Top Material: ______________________________________________
Great Room ____________________ Counter Top Material: ______________________________________________
20. PLUMBING: ( It is best to take this list to a plumbing supply company to complete )
Kitchen Sink ___________________________________________Faucet _____________________________________
Vegetable Sink _________________________________________Faucet _____________________________________
Powder Room Lavatory _________________________________Faucet _____________________________________
Powder Room Water Closet ___________________________________________________________________________
Master Bath Lavatory ___________________________________ Faucet _____________________________________
Master Bath Water Closet ____________________________________________________________________________
Master Bath Tub _______________________________________ Faucet _____________________________________
Master Bath Shower _____________________________________Faucet _____________________________________
Hall Bath Lavatory _____________________________________ Faucet _____________________________________
Hall Bath Tub __________________________________________Faucet _____________________________________
Hall Bath Shower ______________________________________ Faucet _____________________________________
Hall Bath Water Closet ______________________________________________________________________________
Other Bath Lavatory ____________________________________ Faucet ____________________________________
Other Bath-Tub Shower _________________________________ Faucet _____________________________________
Other Bath Water Closet _____________________________________________________________________________
Utility Room Sink ______________________________________ Faucet ____________________________________
Garage Sink ___________________________________________ Faucet ____________________________________
Bath Accessories: Type of Mirrors _____________________________Allowance______________________________
Shower Enclosures _______________ Fiberglass Units ____ Ceramic Tile on Walls ____ Marble on Walls
Tub Deck ____ Fiberglass Unit ____ Ceramic Tile __________________________________ Other
Shower Pan ____ Molded Unit ____ Ceramic over vinyl liner __________ Shower Door Allowance____ Curtain Rods
Water Supply: ____ Public ____ Individual Well ___________ Community System
Sewage Disposal ____ Public ________ Septic Tank ____________ Community System
Water Piping Material______________________________________________________________________________
House Drain Material ______________________________________________________________________________
Number of Water Heaters _____ Tank Size ______Gas Tankless ______ Make________________________________
Gas Service _____ Utility Company ____ Liquid Pet.
Gas Locations _____ Range _____ Water Heater ____ Fireplace ____ Dryer ____ Deck __ Front Porch
21. HEATING & AIRCONDITIONING:
Make __________________________________________ Number of Units Required ____________________________
____ Electric Heat Pumps ____ Gas Heat w/ Electric Air Cond. ____ Gas Pack Units _______ Geothermal
22. ELECTRICAL:
Service Panels Required ___________________ Emergency Generator _________________________________
Special Outlets Required _____________________________________________________________________________
Who will furnish the Light Fixtures ? __________ The Builder _________ The Owner’s
Type of Switch Plates & Outlets _______________________________________________________________________
23. KITCHEN EQUIPMENT: (Check all that apply)
Will the Appliances be Furnished by: ___ The Builder ____________ The Owner’s
____ Cook Top ____ Range ____Vented Hood ____ Down Vent Hood ____ Wall Oven(s) ____ Microwave
____ Dishwasher(s) ____ Disposal Trash Compactor ____Warming Drawer ____ Under Counter Ice Maker
____ Refrigerator Size ____ Freezer ____ Wine Cooler
24. MISCELLANEOUS:
_____ Number of Smoke Detectors (hard wired with battery back-up required)
_____ Number of Telephone, Television & Internet Hook-ups Required ________________________________________
Do you desire a Central Security System __________ Do you desire a Central Vacuum System _________________
If an Elevator is shown in your plans, will it be roughed-in only _________ Installed at construction _________________
Do you desire an intercom or stereo system ______________________________________________________________
Do you desire a Underground Sprinkler System ___________________________________________________________
25. FRONT PORCH:
Ceiling Material ___________________ Porch Beam Material _________________ Columns _____________________
Handrail Material ___________ Balusters Material ___________________________ Floor Material ________________
Step Material ______________________________________________________________________________________
26. BACK PORCH:
Ceiling Material ___________________ Porch Beam Material _________________ Columns _____________________
Handrail Material __________________Balusters Material ____________________ Floor Material ________________
Step Material ______________________________________________________________________________________
27. DECK & BALCONIES:
Floor Material ___________Handrail Material ___________ Baluster Material ________________ Steps ____________
28. GARAGE:
_______ Finished ____________ Unfinished _____________ Number of Garage Door Operators
29. WALKS & DRIVEWAYS:
(Walks) ______ Concrete ______ Brick Pavers
(Driveway) _____ Concrete ______ Brick Pavers ____ ROC ____Dirt ____ Other
30. LANDSCAPING & PLANTING: (Note: A Landscape Plan will probably be required by your ARB)
Sod: Front Yard ____ Side Yard ____ Rear Yard ____ _____ Furnished By Owner ___ Furnished By Builder
Printable Information Needed To Complete A Set Of Specifications